Eskom is South Africa's primary electricity supplier and supplies some 95 percent of the country's electricity requirements – more than half of the power generated in the whole of Africa.
Eskom is responsible for the generation, transmission and distribution of electricity from its 24 power stations, with a combined nominal capacity of 40,585 megawatts and over 16442 miles of transmission lines.
"Tait Communications has given us a platform for radio communications for all of our districts. In times of storms, we may be the only folks with communications along with emergency services."
Situation
Maintenance and repair of Eskom's huge electricity transmission network requires an efficient communications system capable of covering the vast areas supplied with electrical power, allowing for rapid deployment of repair crews when required.
Eskom has its own radio infrastructure, made up of a conventional all-informed radio network that covers all of South Africa. The network is divided into seven regions, with each region having a central control point to which all repeaters in a region are connected via various bearers.
Before the introduction of the mobile data system, all job dispatching was done via voice communications. There was no vehicle-location system in use – such a system would have allowed a service unit closest to the job-site to be dispatched.
Response
The SMK mobile data system (specifically developed for Eskom) was designed and built by the Research and Development division of Emcom Africa, which is the exclusive South African distributor for Tait Communications.
The mobile data system is made up of a combination Mobile Data Terminal (MDT)/ enhanced control head, a radio controller/modem and a GPS unit fitted to Tait mobile radios, which have specially modified firmware.
Eskom's existing radio communications infrastructure was used without modification except for the addition of modem arrays at the control points. Eskom's existing Tait mobile radios were retro-fitted with the mobile data equipment as required, and a number of additional complete new mobile radio units were supplied to make up the 2,000 required.
The computer-aided dispatch system used by Eskom was linked to the new mobile data system, allowing automatic job allocation and recording of job progress milestones. Vehicle position information was also made available to Eskom's GIS system, allowing more efficient allocation of technical resources.
Outcomes
After the system was made operational, Eskom reported that voice traffic on the radio network was drastically reduced and efficiency of job turnaround increased by some 40 percent. Misunderstandings between dispatcher and operator have also been significantly reduced thanks to text dispatching. A noticeable improvement in customer satisfaction has also been recorded.
In addition, operator security was increased by having a panic facility available should the need arise.
Other client stories you may be interested in
Tait proposed DMR Tier 3, a market-leading, open standards based 12.5khz communications solution, which can operate in a wide range of globally applicable VHF and UHF frequencies. For SCADA telemetry, Tait proposed its centralised GridLink SCADA gateway.
Ergon Energy supplies electricity in Queensland, Australia with their service area covering 97% of the state’s geographical area – from the expanding coastal and rural population centers to the remote communities of outback Queensland and the Torres Strait.
The 21-site VHF DMR deployment will utilize the TN9300 core network and support the use of 1,200 TP9300 DMR portables and TM9300 mobiles by KCP&L staff.ax